Star 历史趋势
数据来源: GitHub API · 生成自 Stargazers.cn
README.md

Synapse — Research Orchestration

Research Orchestration for Human Researchers and AI Agents

中文

Synapse is a research orchestration platform that brings human researchers and AI agents together. It manages the full research lifecycle — from literature review and question formulation through experiment execution and report generation — with built-in agent management, compute orchestration, and real-time observability.

Synapse architecture

Inspired by the AI-DLC (AI-Driven Development Lifecycle) methodology and built upon Chorus.

Milestone: We reproduced Karpathy's auto-research task and outcome pattern on Synapse. Unlike designing the behavior of a single agent through a program.md, Synapse treats autonomous experimentation as a native platform capability. Research projects, experiment lifecycles, compute allocation, and context accumulation are all managed through structured MCP tools, creating dynamic contexting. Research memory is persisted in the platform and exposed as tool-based state that agents can call, fetch, and expand on demand according to the current situation, rather than forcing everything to be loaded into an agent's context window up front.

Synapse autoresearch progress


What's New

v0.8.0 — Sub-Agent Observability, Auto-Loop Pill Shader & Critical Plugin Fix (2026-05-22)   🔴 New

  • Critical fix — plugin no longer wipes ~/.synapse/: when Claude Code launched from $HOME, the SessionEnd hook's rm -rf $STATE_DIR could delete the user's PGlite database. The hook now only removes its own artifacts and uses rmdir on the parent — sibling data/ directories survive. Upgrade strongly recommended.
  • Sub-agent experiment checkin: new SessionExperimentCheckin table plus synapse_checkin_experiments MCP tool let parent sessions hand off experiment context to sub-agents and auto-close them on SubagentStop, ending the 1-hour heartbeat-timeout pile-up after hard CC exits.
  • Auto loop pill animation: when an autonomous loop is active, the status pill on the Experiments board now renders a slow liquid mesh-gradient (WebGL) — emerald/cyan in Human Review, emerald/cyan/violet in Full Auto. Honors prefers-reduced-motion and falls back to the previous static tint on WebGL failure.
  • Plugin hooks tightened: on-session-start swaps its inline tool inventory for a stage-skill router (~5k tokens saved per session), on-subagent-stop runs async and surfaces auto-checked-out experiment bindings, and several hook prompts soften "MUST" language so agents can deviate with documented reason.
  • Claude Code plugin bumped to 0.9.0, npm @synapse-research/synapse to 0.3.0, Docker image vincentwei1021/synapse:v0.8.0 (:latest follows).
v0.7.0 — PGlite Local Mode & Server Action Fix (2026-04-20)
  • One-command local install: npm install -g @synapse-research/synapse && synapse — zero-dependency PGlite mode, no PostgreSQL or Redis required
  • Fixed critical bug where research question creation silently failed in standalone mode (server actions replaced with REST API)
  • Fixed cache directory permission error when installed globally via sudo npm install -g
  • Completion notifications now show a checkmark icon instead of a plain dot
  • Health check no longer reports "degraded" when Redis is configured but not yet lazy-loaded
v0.6.1 — Experiment Board UI Polish (2026-04-15)
  • Project descriptions on the dashboard now preserve intentional blank lines when expanded, improving readability for structured briefs
  • The experiment plan side panel now renders above the detail sheet overlay, uses the shared panel background, and allows normal text selection
  • The autonomous experiment entry button is more prominent, with refreshed blue styling and a yellow lightning icon for faster scanning
  • The experiment detail sheet is wider on large screens, giving experiment plans, results, and progress logs more room
v0.6.0 — Agent Types & Research Copilot (2026-04-12)
  • Agents now have a type field (OpenClaw or Claude Code) with internal transport mapping — Web UI dispatch features only show realtime-capable agents
  • Claude Code Research Copilot: SessionStart presents projects with progress summaries and guides users through the research lifecycle (paper search → deep research → questions → experiments → analysis)
  • synapse_checkin returns assigned experiments and project progress for intelligent workflow suggestions
  • Agent management UI gains a type selector and badge display
v0.5.1 — DeepXiv Integration (2026-04-10)
  • Paper search now uses DeepXiv hybrid search (BM25 + vector) over arXiv, with arXiv API as fallback. Removed Semantic Scholar and OpenAlex.
  • Agents can read full paper content via progressive reading tools: synapse_read_paper_brief, synapse_read_paper_head, synapse_read_paper_section, synapse_read_paper_full
  • Deep research literature reviews are now based on actual paper content, not just abstracts
  • DeepXiv token configurable from Settings > Integrations
v0.5.0 — Autonomous Loop & Related Works (2026-03-29)
  • Autonomous experiment loop: agents propose → humans review → agents execute
  • Related Works page with auto-search, manual arXiv URL addition, and deep research reports
  • Experiment live status tracking (sent/ack/checking/queuing/running)
  • Compute pool binding per project

Table of Contents

Vibe Research

Vibe Coding showed that people can describe intent and let AI handle execution. Vibe Research applies that same shift to the research lifecycle:

Humans set direction. Agents execute, report, propose, and iterate. Humans review, steer, and decide.

Stages of Agent Autonomy in Research

Stages of Agent Autonomy in Research

Synapse is built to move research teams through these stages deliberately.

  • Streamline Stage 1 by making experiment execution, compute access, result capture, and reporting a default operational loop instead of a pile of manual handoffs.
  • Make Stage 2 reliable by keeping context, papers, experiments, progress, and review in one system, so agents can act independently without drifting off-task.
  • Make Stage 3 feasible by building the control plane for project-level delegation: structured context, observability, orchestration, permissions, and human steering when it matters most.

Features

Project Workspace

Synapse project dashboard

Synapse gives each research project a shared operational home for briefs, datasets, evaluation methods, research questions, experiments, reports, and rolling synthesis. Instead of bouncing across docs, scripts, spreadsheets, and chat threads, humans and agents work from the same source of truth.

Related Works and Deep Research

Synapse related works page

  • Paste an arXiv URL to add a paper with metadata fetched automatically
  • Assign a pre_research agent to search Semantic Scholar and build a project paper set
  • Generate literature review documents directly inside the project workspace

Research Question Canvas

Synapse research question canvas

  • Organize research questions in a canvas-style hierarchy with parent-child structure
  • Track question progress from exploration to experiment creation and completion
  • Keep question context connected to the experiments and reports it produces

Experiment Execution Board

Synapse experiment board

  • Five-column experiment pipeline: draft → pending_review → pending_start → in_progress → completed
  • Live status badges for agent execution: sent, ack, checking_resources, queuing, running
  • Progress reporting through synapse_report_experiment_progress
  • Autonomous loop support, so agents can propose the next experiments when queues are empty

Agent Management

Synapse agent management

  • API-key based agent access to Synapse MCP tools
  • User-scoped agent ownership, key management, and session observability

Five agent permission roles (composable):

PermissionResponsibility
Pre-researchLiterature search, related works discovery via Semantic Scholar
ResearchPropose research questions, hypothesis formulation
ExperimentExecute experiments, allocate compute, report progress
ReportGenerate experiment reports, literature reviews, synthesis documents
AdminCreate/delete projects, manage groups, review research questions

Compute Orchestration

Synapse compute management

  • Compute pools, node inventory, GPU reservations, and per-project pool binding
  • Managed SSH access bundles for secure compute access from agent environments
  • Keep agents aligned with available resources before, during, and between runs

Reports, Synthesis, and MCP Surface

  • Agents write experiment reports in the context of the project instead of filling rigid templates
  • Synapse maintains project-level synthesis documents as research evolves
  • 70+ MCP tools cover project context, literature search, experiment execution, compute access, and collaboration

Getting Started

Quick Start (No Dependencies)

npm install -g @synapse-research/synapse
synapse

Open http://localhost:13000 and log in with admin@synapse.local / synapse.

This runs Synapse with an embedded PGlite database — no PostgreSQL or Redis required. Data is stored in ~/.synapse/data.

Options: synapse --port 3000 --data-dir /path/to/data --help

Docker

git clone https://github.com/Vincentwei1021/Synapse.git
cd Synapse

export DEFAULT_USER=admin@example.com
export DEFAULT_PASSWORD=changeme
docker compose up -d

Open http://localhost:3000 and log in.

Local Development

Prerequisites: Node.js 22+, pnpm 9+, PostgreSQL

cp .env.example .env
# Edit .env to configure DATABASE_URL

pnpm install
pnpm db:push
pnpm dev

open http://localhost:3000

The default .env.example includes a built-in login account:

FieldValue
Emaildev@synapse.local
Passwordsynapse123

You can change these by editing DEFAULT_USER and DEFAULT_PASSWORD in your .env file. When both variables are set, Synapse enables a simple email/password login without requiring OIDC configuration.

Connect AI Agents

Option 1: OpenClaw (Recommended)

openclaw plugins install @vincentwei1021/synapse-openclaw-plugin

Then configure in OpenClaw settings: set synapseUrl and apiKey.

Tip: If you encounter Request timed out before a response was generated, increase the idle timeout in your OpenClaw config: set agents.defaults.llm.idleTimeoutSeconds to 300.

Option 2: Claude Code Plugin

claude
/plugin marketplace add Vincentwei1021/Synapse
/plugin install synapse@synapse-plugins

Set environment variables:

export SYNAPSE_URL="http://localhost:3000"
export SYNAPSE_API_KEY="syn_your_api_key"

Option 3: Codex Plugin

Codex currently supports only the paper-search phase. Create the agent in Synapse with type codex; the codex type is restricted to the pre_research role (the agent dialog enforces this). Broader phases (experiments, reports) are not yet wired for Codex.

The MCP server is not bundled in the plugin (Codex cannot env-expand a plugin's .mcp.json), so you configure it yourself once. The steps differ slightly between the CLI and the desktop App.

Codex CLI

codex plugin marketplace add Vincentwei1021/Synapse
codex plugin add synapse@synapse-plugins

export SYNAPSE_URL="http://localhost:3000"
export SYNAPSE_API_KEY="syn_your_api_key"
codex mcp add synapse --url "$SYNAPSE_URL/api/mcp" --bearer-token-env-var SYNAPSE_API_KEY

Run codex mcp add before launching Codex (it writes ~/.codex/config.toml, which is read at startup).

Codex App (desktop)

  1. Add the marketplace. Open Plugins → Built by OpenAI → Add more, enter the source https://github.com/Vincentwei1021/Synapse.git, then switch the marketplace selector to synapse-plugins.
  2. Install the plugin. Under Productivity → Synapse, click the + to install, then open the plugin to configure it.
  3. Configure the MCP server. In the plugin's config, Add server:
    • Name: synapse
    • Transport: Streamable HTTP
    • URL: http://localhost:3000/api/mcp
    • Bearer token: paste your syn_... API key directly (the App takes the token value here, so no environment variable is needed).
  4. Trim skills. Keep only the Research skill enabled; uncheck the others (they target phases Codex does not support yet).

The App lets you paste the token value directly, so — unlike the CLI's --bearer-token-env-var flow — you do not need to export SYNAPSE_API_KEY or use launchctl setenv.

Option 4: Manual MCP Configuration

Create .mcp.json in your project root:

{
  "mcpServers": {
    "synapse": {
      "type": "http",
      "url": "http://localhost:3000/api/mcp",
      "headers": {
        "Authorization": "Bearer syn_your_api_key"
      }
    }
  }
}

Progress

Implemented

  • Research-project workspace with briefs, datasets, evaluation methods, experiments, documents, and rolling synthesis
  • Research-question hierarchy and canvas-style question management
  • Five-stage experiment board with live execution status and progress updates
  • Agent-generated experiment reports and project-level synthesis documents
  • Related works workflow with Semantic Scholar search, paper collection, and deep research reports
  • Composable agent permissions: pre_research, research, experiment, report, admin
  • User-scoped agent ownership, API keys, and agent session observability
  • Compute pools, node inventory, GPU reservations, and project-level pool binding
  • Managed node access bundles for secure agent access to compute
  • Autonomous experiment proposal loop for keeping project momentum when queues empty out
  • Comments, mentions, notifications, and real-time SSE updates
  • 70+ MCP tools covering context retrieval, literature, experiments, compute, and collaboration

Planned

  • Steer running agents during an in_progress experiment
  • Stream raw experiment logs back into the panel in real time
  • Run experiments in parallel via isolated git trees / worktrees
  • Strengthen evaluation loops with first-class baselines and accept/reject criteria
  • Track reproducibility artifacts: code revision, config, outputs, and environment

Documentation

DocumentDescription
CLAUDE.mdDevelopment guide and coding conventions
ArchitectureTechnical architecture
MCP ToolsMCP tools reference
OpenClaw PluginPlugin design and hooks
DockerDocker deployment guide

License

AGPL-3.0 — see LICENSE.txt

关于 About

Research orchestration platform where human researchers and AI agents collaborate

语言 Languages

TypeScript95.3%
Shell2.9%
JavaScript1.0%
HTML0.6%
CSS0.2%
Dockerfile0.1%

提交活跃度 Commit Activity

代码提交热力图
过去 52 周的开发活跃度
865
Total Commits
峰值: 139次/周
Less
More

核心贡献者 Contributors