Star 历史趋势
数据来源: GitHub API · 生成自 Stargazers.cn
README.md

OpenChatCut

OpenChatCut

简体中文 · English

Open-source ChatCut alternative · agent-native · local-first AI video editor

Let Codex, Claude Code, and the built-in agent read, edit, and export real video projects that remain fully editable. Website: openchatcut.com

Introduction · Product Tour · Quick Start · Agent / MCP · Sponsor · Changelog · Star Growth · Contributing

GitHub Repository Discord Community Status Local First TypeScript React Remotion Electron MCP

OpenChatCut - Open-source AI agent video editor with a real timeline | Product Hunt

OpenChatCut editor overview with the agent workspace, media pool, preview, and multitrack timeline

From a single instruction to a real timeline: agents, media, previews, motion graphics, transitions, effects, and multitrack audio all work together in one project.


What is OpenChatCut?

OpenChatCut is an open-source ChatCut alternative: a video editor that brings conversational agents and professional timeline editing into the same workspace. It is independent open source (AGPL), not affiliated with the commercial ChatCut product.

OpenChatCut = local video projects + multitrack timeline + AI agents + MCP + production-ready exports.

It does not merely generate a video that can no longer be changed. Every edit is written to real tracks, clips, transitions, captions, effects, and media inside the project. You can continue editing manually, undo or redo changes, save versions, or hand the project to another agent.

OpenChatCut is built for creators and developers who want AI to participate in the actual editing workflow without giving up professional control, rather than starting over from an empty chat box or an immutable generated result.

  • Website: https://openchatcut.com

  • Open-source ChatCut alternative guide: https://openchatcut.com/blog/open-source-chatcut-alternative

  • ChatCut vs OpenChatCut: https://openchatcut.com/blog/chatcut-vs-openchatcut

  • 🤖 Agent-native: the built-in agent and external MCP agents share the same editing tools.

  • 🎞️ Real timeline: multiple video and audio tracks, transitions, effects, LUTs, zooms, and keyframes.

  • 📝 Transcript-driven editing: word-level transcription, text-based cuts, pause handling, speakers, and linked captions.

  • ✨ Generation and media: images, video, speech, music, sound effects, and online media search.

  • 🧩 Motion Graphics and WebGL: editable motion templates, custom shaders, visual effects, and transitions.

  • 📦 Production-ready exports: MP4, audio, captions, FCPXML, and complete project data.

  • 🖥️ Local-first: projects and media stay on your machine by default, while API keys remain server-side.


Sponsor

If OpenChatCut helps you, you can support its continued development on Ko-fi or Afdian.

Support me on Ko-fi Support OpenChatCut on Afdian


Product Tour

The following screenshots show real OpenChatCut projects and editor states, not static mockups.

OpenChatCut local project dashboard
Local project management — Create, import, duplicate, export, and continue editing multiple real projects.
An agent generating music and editing transitions on a multitrack timeline
Complete agent-driven editing — Generate music, invoke tools, and write transitions, captions, and multitrack media directly to the timeline.
Agent tool execution history and the Motion Graphics library
Motion Graphics and agents — Browse motion templates or let an agent generate and assemble editable MG clips.
OpenChatCut WebGL visual effects library
WebGL visual effects — Apply pixelation, duotone, fisheye, kaleidoscope, softening, light leaks, and more directly to clips.
OpenChatCut camera movement and zoom effects library
Camera movement and zoom — Push, pull, slow zoom, fast zoom, and eased camera effects work directly with the timeline.
Comparing LUT color styles in OpenChatCut using a Tokyo Tower reference image
LUTs and color styles — Compare camera transforms and film looks in real time against a consistent reference frame.

Why OpenChatCut?

Traditional editors excel at precise control. One-shot AI video generators excel at producing results quickly. OpenChatCut connects both approaches through one continuously editable project:

CapabilityTraditional timeline editorOne-shot AI video generationOpenChatCut
Track- and clip-level precision✅❌✅
Modify a project with natural language❌✅✅
Inspectable and undoable changes✅Usually unavailable✅
Linked transcript and visualsPartial❌✅
Direct control from Codex / Claude Code❌❌✅ MCP
Built-in and external agent collaboration❌❌✅ Shared tools
Local projects and BYOKProduct-dependentUsually cloud-based✅

The core editing loop:

Describe the goal → Agent reads the project → Produces verifiable edits → Writes to the timeline
                  → Preview / adjust / undo → Captions and mixing → Export

Core Capabilities

AreaImplemented capabilities
TimelineMultitrack editing, move, trim, split, ripple edits, snapping, keyframes, markers, undo, and redo
VisualsWebGL effects, LUTs, chroma key, zoom, transitions, and custom shaders
AudioMultiple audio tracks, sound effects, background music, voice-over recording, loudness, auto-ducking, and vocal isolation
TranscriptTranscription jobs, word-level editing, pause compression, search, speakers, and clip views
CaptionsAutomatic captions, named styles, translation, timeline overlays, and SRT export
Motion GraphicsBuilt-in templates, a secure sandbox, custom templates, and video rendering
AI generationImage, video, speech, music, and sound-effect jobs with progress tracking
MediaUploads, folders, online image/video/audio search, and Firecrawl visual-media fallback
ExportMP4, audio, captions, FCPXML, project import/export, export history, hardware-aware H.264 acceleration, and resource-aware export queueing
AgentBuilt-in conversational agent, skills, proposal-based edits, and external Streamable HTTP MCP

Community Resources

The OpenChatCut resource library is a shared catalog for reusable MG animations, sound effects, transitions, visual effects, zooms, and LUTs.

OpenChatCut community resource library

Discover and install

  • Hover visual cards to watch the complete result, or play audio resources before downloading.
  • Copy a resource's install URL into OpenChatCut's Extension Center, or download its original package.
  • Browse the website catalog inside the editor and manage installed extensions locally.

Contribute a resource

  1. Open Contribute a resource and choose its category.
  2. Upload the resource and the category-specific preview inputs; the site renders the published preview.
  3. Add the creator and license information, then submit it for review and publication.

Installable visual resources use the editor's openchatcut-plugin@1 format and runtime validation. Official OpenChatCut resources use the MIT license; community contributors select a license during submission, and each published card identifies its creator and license.


Use Cases

  • Talking-head and interview editing: transcribe audio or video, remove mistakes, pauses, and repetition through text, then generate captions automatically.
  • Fast multiformat assembly: import video, images, and audio, then let an agent create the rough cut, transitions, soundtrack, and pacing.
  • Short-form and social content: reframe the canvas and generate titles, captions, voice-over, music, and visual packaging.
  • Motion Graphics: use built-in templates or ask an agent to create editable motion-graphics clips.
  • Developer automation: use MCP to let Codex, Claude Code, or another compatible client inspect and modify a real project.

Workflow

  1. Create a project and import local media.
  2. Edit manually on the timeline or describe the result you want.
  3. The agent reads project context and invokes editing tools.
  4. Review the proposal and preview the result, then apply, adjust, or undo it.
  5. Finish captions, audio, effects, and color.
  6. Export video, audio, captions, FCPXML, or the complete project.

Quick Start

Desktop installers

Download the latest macOS, Windows, and Linux builds from GitHub Releases. The release currently includes DMG installers for Apple Silicon and Intel Macs, an x64 Windows installer, and an x64 Linux AppImage.

These are early builds. The macOS packages are not yet signed or notarized, so the operating system may require manual approval on first launch.

Run from source

Requires Node.js 24.x and npm. The supported Node.js range is enforced by package.json, and .nvmrc selects the matching major version for Node version managers.

git clone https://github.com/0xsline/OpenChatCut.git
cd OpenChatCut
npm install
cp .env.example .env.local
npm run dev

Open:

http://localhost:5199

Only add the model or media-service credentials you actually use to .env.local. Features without configured third-party credentials report the missing key explicitly; local timeline editing, built-in media, and other configured capabilities continue to work.

Local H.264 exports automatically prefer VideoToolbox on macOS and NVENC on compatible Windows systems, then fall back to software encoding. Tune render concurrency and the heavy-export limit with OPENCHATCUT_RENDER_CONCURRENCY and OPENCHATCUT_MAX_ACTIVE_EXPORTS, disable hardware encoding with OPENCHATCUT_DISABLE_HARDWARE_ENCODING, or override FFmpeg-side encoder selection with OPENCHATCUT_H264_ENCODER; see .env.example.

Company Hackathon Seedance quick start (fork)

Company teammates who have their own Hackathon key should use the fork that contains the custom Seedance gateway adapter. Each teammate keeps a separate local key and quota; never copy another person's .env.local.

git clone https://github.com/tt-a1i/OpenChatCut.git
cd OpenChatCut
npm install
cp .env.example .env.local

Add only your own key to .env.local:

SEEDANCE_PROVIDER=custom
SEEDANCE_AUTH_TYPE=api-key
SEEDANCE_BASE_URL=https://maas.devops.xiaohongshu.com/hackson
SEEDANCE_CREATE_PATH=/openai/doubao/contents/generations/tasks
SEEDANCE_POLL_PATH=/openai/qwen/v1/tasks/{taskId}
SEEDANCE_API_KEY=YOUR_OWN_HACKATHON_KEY
SEEDANCE_VIDEO_MODEL=Doubao-seedance2.0

Then start the editor:

npm run dev

Open http://localhost:5199, create a project, and use Settings → AI Services → Video → Seedance to confirm the configuration is present. The connection check is read-only and does not spend video quota; the first real generation validates the key. Finish active generations before changing .env.local, because Vite restarts clear the development server's in-memory job registry.

Detailed adapter behavior and troubleshooting are documented in docs/company/hackathon-video.md.

Give this repository to an AI coding agent

Paste the following prompt into Codex or Claude Code from the repository root:

Set up this OpenChatCut fork for the company Hackathon Seedance service.
Read README.md, docs/company/hackathon-video.md, and
skills/openchatcut/SKILL.md before acting. Never print, copy, or commit my key.
Check Node.js 24 and the current git status, create .env.local from
.env.example if needed, tell me exactly where to place my own key, install
dependencies, start OpenChatCut on port 5199, and verify the local app and MCP
endpoint. Do not submit a quota-consuming video generation unless I explicitly
ask. When I later request a short film, default to the fast workflow: one
approved visual anchor, one validation shot, remaining independent shots in
parallel, no last-frame generation unless continuity requires it, 720p drafts,
and a 1080p final export after review.

External MCP agents can safely inspect and edit the timeline, but paid video generation remains an immediate side effect and is intentionally not part of the draft-safe MCP edit session. Generate inside OpenChatCut after explicit user approval, then use MCP for assembly, transitions, titles, mixing, and verification.

Desktop development

npm run desktop:dev

The desktop app uses an Electron shell with the same embedded services. The web development build and desktop build share project, agent, generation, and export logic.


Project Status

OpenChatCut is under active development. The editor, project format, and agent tools will continue to evolve. Prebuilt macOS, Windows, and Linux installers are published on GitHub Releases; running from source remains the most transparent option for development and troubleshooting.

The core timeline, local projects, built-in media, and manual editing do not depend on cloud services. Connected features such as AI models, online media, generation, and transcription are enabled only after you configure the corresponding services.


Using OpenChatCut with Codex / Claude Code

Install the single OpenChatCut Agent Skill:

npx skills add 0xsline/OpenChatCut

Then tell the agent Set up OpenChatCut. The installed router registers the local MCP connection and loads the editor's 15 specialized skills on demand, so the agent's skill list stays compact.

OpenChatCut exposes a Streamable HTTP MCP endpoint:

http://localhost:5199/api/external-mcp/mcp

The repository's root .mcp.json already contains the local connection. Before using timeline tools, run OpenChatCut and open the target project. Project listing, creation, and navigation tools do not require the editor to remain open.

Codex app/CLI and Claude Code use the same session workflow:

  1. Call begin_edit_session and keep the returned editSessionId. Set approvalMode to manual (the default) or auto.
  2. Pass that id to every project read/edit tool. Changes are applied only to an isolated draft.
  3. Call review_edit_session when the draft is ready.
  4. In manual mode, review, preview, select, and approve or reject the proposal inside the open OpenChatCut project. In auto mode, review_edit_session applies the complete draft immediately. The client can poll get_edit_session for applied, rejected, or discarded status.

Approval in Codex or Claude controls whether the client may call a tool. OpenChatCut project approval is required only for manual sessions; auto sessions explicitly bypass that review. Either mode commits the applied operations atomically as one undo step. If an auto session becomes stale, it returns an error instead of falling back to manual approval; discard it and start a new session. Only draft-safe project read/edit tools are exposed in these sessions. Generation, export, project deletion, and other immediate side-effect tools stay unavailable because a rejected proposal could not roll them back.

Codex

Add the following to your Codex configuration:

[mcp_servers.openchatcut]
url = "http://localhost:5199/api/external-mcp/mcp"

Claude Code

claude mcp add --transport http openchatcut \
  http://localhost:5199/api/external-mcp/mcp

You can then describe an editing task directly to the agent:

Start an OpenChatCut edit session. Read the draft, add a scratch sound effect
at 8 seconds on the second audio track, and add a glitch transition between
the adjacent video clips. Submit the draft for review and wait for the user to
approve it in OpenChatCut before reporting that the edit was applied.

External agents invoke the same internal editing tools and EditorCore commands as the editor itself. There are no separate project formats that can drift apart, and the live timeline is not changed while an external draft is being prepared.

Protecting MCP access

When exposing the MCP endpoint yourself, configure:

OPENCHATCUT_MCP_TOKEN=your-token
OPENCHATCUT_EDITOR_URL=https://your-editor.example.com

Clients must send Authorization: Bearer <token>. The current bridge is designed for a single user on one machine, not as a multi-tenant service.


Architecture

OpenChatCut runtime architecture connecting agents, MCP, EditorCore, local storage, preview, rendering, and export

One shared set of agent tools and EditorCore commands connects the built-in agent, external MCP clients, the real timeline, local data, and production exports.

LayerTechnology
FrontendReact 19, TypeScript 6, Vite 8
Editing coreImmutable timeline state, command layer, and proposal-based application
AgentVercel AI SDK 7 (Anthropic, OpenAI, Gemini, Kimi, Qwen, GLM, DeepSeek, MiniMax, Xiaomi MiMo, Mistral, and compatible APIs), Agent Skills, MCP SDK
Preview and visualsRemotion Player, WebGL / GLSL
ServerDual-host Vite / Electron plugins and a server-side keystore
PersistenceShared local project store under ~/.openchatcut, IndexedDB cache, configurable local media directory, optional Cloudflare R2
DesktopElectron 43
ExportRemotion, FFmpeg, FCPXML, SRT

Directory Overview

DirectoryResponsibility
src/editor/Timeline state and commands, independent of UI and LLMs
src/agent/Agent assembly, tools, skills, progress, and settings
src/library/Library UI for Motion Graphics, sound effects, transitions, effects, LUTs, and more
src/transcript/Transcription, word-level editing, and transcript UI
src/captions/Caption models, styles, controls, and preview layer
src/gl/WebGL effects, transitions, and shader runtime
src/generate/Clients for image, video, speech, music, and sound-effect generation
src/persist/Project, chat, version, and media persistence
server/plugins/Generation, transcription, media, export, and storage services
desktop/Electron main process and embedded services
remotion/Headless rendering and export pipeline

Data and Privacy

  • Projects, chat history, and version data are stored in the shared local store under ~/.openchatcut; IndexedDB provides a browser-side cache and legacy-data migration.
  • User media is stored in a local media directory that you can back up or migrate.
  • Whether AI requests leave your machine depends on the model, generation, or media services you configure.
  • Unconfigured cloud features do not affect the local timeline or editing of existing media.
  • When exposing MCP externally, configure a Bearer Token and restrict network access to the editor endpoint.

Security Model

  • API keys are only available to server-side configuration; vendor credentials must never be exposed to the browser through VITE_.
  • LLM output, plugin packages, template code, and user input are validated at trust boundaries.
  • Motion Graphics and shader code run in a restricted sandbox, with dedicated checks blocking malicious templates.
  • Agents modify projects only through EditorCore commands, making edits traceable and undoable.
  • MCP binds locally by default; public endpoints support Bearer Token authentication.
  • Local media directories and R2 credentials are managed by the server and never written into project JSON.

Development and Verification

# Type checking and production build
npm run build

# Core regression checks
npm test

# Static analysis
npm run lint

After changing the agent, timeline, preview, or export paths, run at least:

npx tsc --noEmit
npm test
npm run build

Technical Foundations

OpenChatCut is built with the following core projects and specifications:

Project / specificationRole in OpenChatCut
ChatCut-Inc/agent-pluginAgent Skills foundation. OpenChatCut adapts the plugin's skill structure and workflows for its local editor, storage, MCP, and tool architecture. See the Agent Skills attribution notice.
RemotionCore foundation for React-based video preview, composition, and server-side rendering.
Model Context ProtocolProtocol foundation that enables Codex, Claude Code, and other external agents to access projects and timeline tools.
Vercel AI SDKProvider-neutral model streaming and tool calling for the built-in Agent.
tt-a1i/archifyTool used to define, validate, and generate the README's runtime architecture diagram.

This list covers the project's major technical foundations. It does not replace the licenses bundled with individual dependencies, fonts, or binaries. See package-lock.json for JavaScript dependency versions and assets/fonts/LICENSES.md for font licenses.


Changelog

See the bilingual CHANGELOG.md for notable changes, or browse all published packages on GitHub Releases.


Star Growth

OpenChatCut Star History Chart


License

OpenChatCut is licensed under the GNU Affero General Public License v3.0 or later. Third-party components and assets remain subject to their respective licenses.


Contributing

  1. Create a branch from main.
  2. Add an executable check for non-trivial logic.
  3. Run npm test, npm run lint, and npm run build before committing.
  4. Open a Pull Request and include screenshots or acceptance evidence for UI or video-behavior changes.

Use GitHub Issues for bug reports and feature requests.

关于 About

Open-source, local-first conversational AI video editor with a professional multi-track timeline, Agent Skills, MCP integration, and Remotion rendering.

语言 Languages

TypeScript94.6%
CSS2.9%
GLSL1.8%
JavaScript0.7%
Dockerfile0.0%
HTML0.0%

提交活跃度 Commit Activity

代码提交热力图
过去 52 周的开发活跃度
105
Total Commits
峰值: 53次/周
Less
More

核心贡献者 Contributors